Experimental Application of Torque Compactor in Well Zhaoshen 17 in Daqing Oilfield
DOI:
CSTR:
Author:
Affiliation:

Drilling Engineering Technology Research Institute of Daqing Drilling,Drilling Engineering Technology Research Institute of Daqing Drilling,Drilling Engineering Technology Research Institute of Daqing Drilling

Clc Number:

TE242.7

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Drilling speed rising in deep wells has experienced with good effects in Daqing oilfield for many years and the new technologies were tested in 2012. TorkBuster torque compactor was introduced for testing in well Zhaoshen 17, the average ROP was 4 m/h even up to 8 m/h. Compared to the conventional drilling in the same interval, at least 5 pipe trips and 5 working days were saved. The successful application of torque compactor in well Zhaoshen 17 could be a new approach to drilling speed rising in Yingcheng group and the below formations in.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:November 22,2012
  • Revised:March 18,2013
  • Adopted:March 18,2013
  • Online: April 23,2013
  • Published:
Article QR Code