Coring Technology of Long Core Sample of Roller Compacted Concrete in A’hai Hydropower Station
DOI:
CSTR:
Author:
Affiliation:

Sinohydro Engineering Bureau 3 Co., Ltd.

Clc Number:

P634.5

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    A 19.28m complete concrete core sample was successfully removed in RCC dam of A’hai hydropower station. The article introduces the coring technology for long concrete cores in drilling equipment selection, drilling material selection, drilling parameter setting and adjustment, core samples pulling breaking and removing out, core positioning and post maintenance.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:November 02,2012
  • Revised:March 18,2013
  • Adopted:March 18,2013
  • Online: April 23,2013
  • Published:
Article QR Code