4/21/2025, 11:41:50 PM 星期一
Overview on Drilling Construction Progress in Wenchuan Earthquake Fault Scientific Drilling Project
CSTR:
Clc Number:

P634

  • Article
  • | |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • | |
  • Comments
    Abstract:

    The paper introduces the drilling operation of Wenchuan earthquake fault scientific drilling project, including drilling progress, technical problems encountered while drilling with the corresponding measures and the achievements obtained during drilling operation.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:August 08,2012
  • Revised:August 08,2012
  • Adopted:August 16,2012
  • Online: September 26,2012
Article QR Code