Abstract:The electronic calculation of limit equilibrium for the design of foundation pit support is based on the foundation pit design software, but the force relationship between the dangerous side wall of foundation pit and the retaining structure could not be reflected in essence. With the case of the foundation pit retaining design for Dalian Yanhai International Center, the above force relationship was visually reduced by hand-calculation to select the retaining schedule.