Abstract:With the continuous standardization in construction market and gradual perfection of various laws and regulations, the sub-contract of tunnel construction is a trend for construction enterprise. Based on the status of implement and management in the projects, analysis was made on the production management and control of tunnel construction, a set of relatively reasonable experiences was summed up to generalize the management of processing organization model of tunnel construction.