Design of Casing Program for YR-3 Well and the Cementing Technique
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

TE249

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    With the example of YR-3 well, the paper discussed the multilevel well completion structure and cementing technology of drilling for geothermal water in underlying limestone-dolomite complete formation of Niutuozhen geothermal field. With this technology, borehole collapsing caused by circulation loss and cementing difficulties due to low equipment capacity can be effectively solved. Construction of several wells proved that it is a successful and effective method for Niutuozhen geothermal field and the similar ones.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:December 15,2011
  • Revised:February 03,2012
  • Adopted:March 28,2012
  • Online: June 29,2012
  • Published:
Article QR Code