Production Technique Research on Shield Segment Precast for Nanjing Changjiang River Tunnel
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

U455.43

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Based on the case of shield segment precast for Nanjing Changjiang tunnel, the precast technique of large diameter shield segment was introduced, and the control measures for precast production technique of high intensity and high permeability-resistance segment were summed up.