Treatment of Drill Pipe Sticking in SR-28 Geothermal Well Collapsing Accident
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

TE249

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In this paper, analysis was made on the causes of drill pipe sticking accident of SR-28 geothermal well by collapsing. According to the different causes, casing mill, measuring sticking point and breaking pack of dynamite and other technical means were adopted, the accident was successfully treated.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:May 27,2011
  • Revised:July 11,2011
  • Adopted:August 07,2011
  • Online: September 28,2011
  • Published:
Article QR Code