Technology of Horizontal Butted Well Construction in Beypazari Natural Alkali Mine of Turkey
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

P634.7

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    According to the study on construction technology of horizontal butted well of Beypazari natural alkali mine, improvement were made on drilling technology, treatment of loss zone, development of well drifting tools for casing and reaming tools in ore seam to support the construction in normal procedure.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:March 21,2011
  • Revised:March 21,2011
  • Adopted:May 22,2011
  • Online: August 01,2011
  • Published: July 25,2011
Article QR Code