High-pressure Jet-grout Retaining Wall for Foundation Pit
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

TU476

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The southern ramp of the Beidaokou overpass is only 2.0m from the resident building at Guangyu Road, Tielin, Liaoning, which makes it impossible to construct the retaining wall with open excavation. Through comparison of various alternatives, the jet-grouting method is adopted. This article describes the jet-grouting process and its benefits.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:August 16,2010
  • Revised:August 16,2010
  • Adopted:December 12,2010
  • Online: March 01,2011
  • Published: February 25,2011
Article QR Code