Construction Control on Excavation Verticality for Super-long Thin Pile
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    By the construction practice of a tower foundation pile in Tianjin, the verticality control for super-long thin pile was tested and studied, some measures were put forward and construction experience was summed up.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:July 16,2010
  • Revised:December 09,2010
  • Adopted:December 18,2010
  • Online: January 24,2011
  • Published: January 25,2011
Article QR Code