Abstract:According to the difficulties of borehole deviation, in-hole collapsing and block-falling, coring and installation in construction in sand gravel stratum, the corresponding technical measures were taken with good construction effect. The paper introduced the construction technology in sand gravel stratum of Hongye power station.