    Abstract:

    Gas pumping-exhaust by drilling construction technology in coalmine is one of the effective ways to reduce the safety risk and the prevention to potential risk in coalmine safety production, the pumping-exhaust well by drilling is an economical and quick way for coalmine safety with very important significance.