Abstract:Based on the successful experience of the application of combined seepage draining technology with horizontal drainage hole, gravel pile and blind ditch in a tailings reservoir of Xiangshan pyrite mine, the paper introduced the construction process of horizontal drainage hole in tailings reservoir and the application prospect of this technology.