Construction Technology of Combined Seepage Draining in Tailings Reservoir of Xiangshan Pyrite Mine
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

TU472.3+;TD745+.22

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Based on the successful experience of the application of combined seepage draining technology with horizontal drainage hole, gravel pile and blind ditch in a tailings reservoir of Xiangshan pyrite mine, the paper introduced the construction process of horizontal drainage hole in tailings reservoir and the application prospect of this technology.