Construction Practice of River Drilling in Flood Season
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    By the engineering case, the paper introduced the selection of drill ship & equipment, drill ship assembling & anchoring positioning, drilling technology & calculation method of kelly overstand and footage per run for river drilling of bridge foundation investigation in flood season. The attentions on river drilling construction were emphasized.