Design of Pre-stressed Anchor Cable Reinforcement for Side Slope of Guilin-Liuzhou Highway
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

U418.5+2

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The paper introduced the design of pre-stressed anchor cable reinforcement for K444+710~822 upline side slope of Guilin-Liuzhou highway. The design scheme demonstration was made on the basis of the analysis on landform and lithology, geological structure characteristics, climate and hydrogeology conditions and formation mechanism of slop deformation destruction, the best reinforcement plan was presented. It has been proved in several raining seasons that the plan was feasible.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:January 12,2010
  • Revised:April 11,2010
  • Adopted:May 04,2010
  • Online: May 26,2010
  • Published: May 25,2010
Article QR Code