Abstract:In Shanghai, a great depth and large scale excavation engineering of complex environment and high deformation requirement was constructed with water insulation by cementsoil mixing pile + twofloor support, hierarchical partition, excavating in limited interval and information construction, the engineering was carried smoothly with satisfactory project results.