Discussion on Pile Foundation Construction Technology in 3-Contract Section of Beijing-Shanghai High-speed Railway
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

U443.15+4

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    High technical standard, large construction quantities, strict requirements on civilized construction and large construction disturbances were the characteristics of Beijing-Shanghai high-speed railway engineering. The paper summed up the pile foundation construction technology in the 3-contract section and discussed the key steps for quality control on cast-in-place pile.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:December 10,2009
  • Revised:January 22,2010
  • Adopted:March 01,2010
  • Online: May 26,2010
  • Published: May 25,2010
Article QR Code