Application of Directional Drilling Technology in the Hole WFSD-1 of Wenchuan Earthquake Fault Scientific Drilling Project
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

P634.7

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In the complicated formation, 2 drill strings were broken in the hole WFSD-1 and 2 fishers were lost in it. Directional drilling was conducted to pass by the accident drilling tools. LZ-89 continuous whipstock was used for sidetracking at the bottom of the cement hole with the depth of 580.07m. A new hole was generated after 3m directional drilling in more than 3 hours. The paper introduced technical points of the directional drilling (sidetracking).

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:November 29,2009
  • Revised:November 29,2009
  • Adopted:November 29,2009
  • Online: January 11,2010
  • Published: December 25,2009
Article QR Code