Abstract:Teriary strutum in Central Hebei is mainly of purplishred mudstone and fine grey sandstone with strong mudstone mud making, some formations are very unstable, which make drilling construction difficult with drill bolcking. The paper summed up the prevention measures for complicated accident in horizontal well construction with a successful treatment case, which could be the reference to horizontal well construction in Central Hebei district and other places.