Construction Technology of Pile Hole for Shanghai-Chengdu High Speed Railway Overpassing Hanjiang Super-long Bridge
CSTR:
Author:
Clc Number:

U473.15+4

  • Article
  • | |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • | |
  • Comments
    Abstract:

    The paper introcuced the drilling construction technology of Shanghai-Chengdu high speed railway in karst strutum, together with the equipments selection, technical parameters determination and the treatment & prevention for commom accidences of drilling construction in such strutum.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:1188
  • PDF: 1311
  • HTML: 189
  • Cited by: 0
History
  • Received:October 28,2009
  • Revised:January 01,1900
  • Adopted:December 08,2009
  • Online: February 09,2010
  • Published: February 25,2010
Article QR Code