Risk Analysis on Entrance with Shallow-buried and Unbalanced Pressure of Jiqingling Tunnel and the Measures
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

U455.4

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Based on the engineering case in Jiqingling tunnel, risk analysis was made on the construction of tunnel entrance in poor geological condition with shallow-buried and unbalanced pressure. Integrated prevention measures for geological diseases were put forward with early support strengthening, short cycling excavating and early support closing.