Treatment of Borehole and Roadway Holing for Coalmine Gas Discharging Well Construction and the Completion Technology
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

TD713+.32;P634.5

Fund Project:

英文基金项目

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The paper introduced the treatment of borehole and roadway holing in the construction process of large diameter coalmine gas discharging well; and also introduced reaming drilling for hole completion, floating settlement for well casting and wallback cementbackfilling for water shutoff and wall cementation.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:August 05,2009
  • Revised:August 05,2009
  • Adopted:October 26,2009
  • Online: December 24,2009
  • Published: November 25,2009
Article QR Code