Blasting Design on Yeshanhe Dock Tunnel
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

U615.6

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Blasting requirements of Yesanhe dock tunnel were analyzed, through the corresponding experience formula calculation, the tunnel blasting parameters were determined to keep vibration velocity in the permit safety of the nearby buildings and promise excavation efficiency.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:July 28,2009
  • Revised:July 28,2009
  • Adopted:October 12,2009
  • Online: December 10,2009
  • Published: November 25,2009
Article QR Code