Abstract:By the secondary pile testing in AWAR-AWAR 2×350MW pulverized power plant in Indonesia, the construction technology was modified with the improvement on bearing capacity of pile foundation in soft, loose, fractured, cavity and honeycomb structure developing and weathering limestone formation.