Abstract:Bored cast-in-place pile post grouting can promote the bearing capacity of single pile, guarantee the pile construction quality and save construction cost, which fit to bored cast-in-place pile engineering in bearing layers of sandy gravel and gravel soil. With the field case, the paper detailed the reinforcement mechanism, construction technology and treatment measures for construction difficulties.