Abstract:Large pipe-shed advanced support technology was applied in construction of tunnel collapsing section of Haoshanyu with large pipe shed diameter and difficult drilling conditions. The engineering quality was controlled by optimum borehole drilling technology, pipe shed parameters design and grouting process with successful experience.