Abstract:With the engineering case of ground treatment for complex soft interlayer of industrial base in land accretion of Beibu Gulf of Guangxi, and according to the specific characteristics of building structures, replacement detritus pile with dynamic compaction method was further applied with good effects in overcoming the large scale of differential settlement of the ground, crossbar drainage, compacting consolidation and improving the bearing capacity of bearing layer.