    Abstract:

    Comprehensive treatment with anchor lattice, retaining wall and anti-slide pile was adopted for landslide control project in Three Gorges Reservoir. In order to increase the slide stability, it is important to construct the ultra-deep pre-stressed anchoring cable at top end of the anti-slide pile and increase the normal stress of slip band. The paper introduced the construction of ultra-deep pre-stressed anchoring cable, borehole for anchor cable, grouting and tension construction.

    Reference
    Related
Get Citation
Share
Article Metrics
  • Abstract:1030
  • PDF: 1281
  • HTML: 183
  • Cited by: 0
History
  • Received:March 27,2009
  • Revised:March 27,2009
  • Adopted:August 22,2009
  • Online: November 16,2009
  • Published: October 25,2009
Article QR Code