Abstract:Dam material miming directly affects project progress of faced rockfill dam. Blasting direct mining technology speeded up the mining velocity compared with time and labor-consuming traditional technology. Blasting parameters were optimized by blasting tests. The paper introduced testing process with the analysis on testing result.