Abstract:A factory building was planed to be built in coastal soft ground. According to the site condition and soil characteristics, vacuum preloading was adopted for soft ground reinforcement. In-situ test data were systematically collected and analyzed in the construction and after construction, which proved that application of vacuum preloading was successful.