Design of Excavation Retaining Scheme for a Business-living Building and the Application Effect
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The paper introduced retaining structure scheme with row-pile + deep mixing pile and the design calculation process and summed up the retaining effect, which provides a successful example of excavation scheme for Yongcheng of Henan.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:February 02,2009
  • Revised:February 02,2009
  • Adopted:April 27,2009
  • Online: September 02,2009
  • Published: August 25,2009
Article QR Code