Abstract:Deep foundation pit of a building in Zhuhai City was constructed in the ground, which original geological element was denuded deficient hills and manual filled and leveled. The depth of the excavation was 10 m, 10 ground displacement observation points, 4 lateral horizontal displacement observation holes and 4 underground water level logging stations were set, construction was carried under monitoring.