Application of Liner Cementing Technology in HTHP Slim-hole
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The liner cementing under high temperature and high pressure in slim-hole is difficult. Well Long-16 is an important preliminary prospecting well in Chuanbei low and flat fold belt of Jiulongshan structure. The original 2159mm hole was designed to complete in Permian, but as well kick and circulation loss happened frequently, 1778mm casing was put down to cement the upper well section ahead of schedule. In this case, 1492mm bit was used to 598800m, and liner cementing was completed. Before cementing, oil gas showed strongly with drilling fluid density of 234g/cm3 and well temperature of 1396℃.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:April 17,2008
  • Revised:September 27,2008
  • Adopted:
  • Online:
  • Published:
Article QR Code