Construction Technology of Directional Butting Connection for Salt Well
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The paper introduced ZJ02-PJ02 butted wells of Xinwen Mining Group, the designed depth of the shaft and the inclined well were 94112m and 120300m, and these two wells was 25200m apart. The designed well structure was trisected with drilling and angle building equipment rationally installed. Tower-type pendulum drilling-assembly was used to prevent well deviation. Drilling pressure, drilling ratio, pumping volume and drilling fluid were selected according to the different situation in different well section, highprecision PST MWD and minimum curvature method were applied to calculate the drilling trajectory to guarantee the butting of two wells.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:May 18,2008
  • Revised:
  • Adopted:
  • Online:
  • Published:
Article QR Code