Design and Construction of Foundation Pit Retaining for Hubei Provincial Armed Police Corps Regimental Commander Building
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Because of complicated geological conditions and neighboring environment in the site of foundation pit of Hubei Provincial Armed Police Corps Regimental Commander Building, combined supporting method was adopted with pile anchor retaining, dry jet mixed pile and anchor wire mesh in shotcrete, so safety was ensured for construction of deep foundation pit, surrounding buildings and underground utilities. Economic and social benefits were achieved with lower cost and shorter construction period.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:March 20,2008
  • Revised:June 17,2008
  • Adopted:
  • Online:
  • Published:
Article QR Code