Abstract:According to the requirement of theoretical study and engineering practice,the data of temperature,stress,surface deformation and soil layers displacement are surveyed in situ during the artificial ground freezing of a tunneling engineering in Shanghai,and the data are analyzed and the regularity is studied.At last,several opinions and conclusion are given.