Abstract:Excessive land subsidence occurred because of drainage consolidation and backfill loading for soft clay foundation of a workshop, static pressure grouting with sleeve valve pipe and anchor static pressure pile underpinning technique were adopted to consolidate the soft ground foundation, and the technical features, consolidation mechanism and construction technology were introduced in this paper.