Hole Completion Technology for Large-tonnage Rectangular Section Pile in Wanfeng Road Bridge
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

TU473.1

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In order to deal with the difficulties in hole completion and resolve serious leakage in pebble and bedrock, we use hydraulic grab as drilling equipment, adopt rational mechanical structure, drilling method, mud prescription in rectangular section pile construction.