Abstract:According to the rock properties and technical conditions in the research area, through the optimization and reasonable gradation of drilling equipments and the analysis on drilling method , bit types and parameters, drilling technology and operating technology, a suit of technical measures for raising the drilling efficiency is obtained. The driller-month efficiency has risen by more than 80% in the construction of gas drainage boreholes in interbedded formation of soft and hard rock in research area.