Abstract:The technique of soilnailing wall is widely applied in Beijing, and the composite support technique for soil-nailing wall and pre-stressed anchor can efficiently control the deformation. The design way and the applicability of this technique is illustrated with a field case, and analysis on some problems encountered during construction are made with the corresponding measures.