Plan of Practicing "5S" Management in Rock and Soil Drilling Engineering Project
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

P634 F273

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    "5S" management is proposed for rock and soil drilling engineering project according to the same management in industrial enterprises.The idea of "5S" management is introduced,and the main tactics of practicing "5S" management are analyzed.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:July 06,2006
  • Revised:July 06,2006
  • Adopted:
  • Online:
  • Published:
Article QR Code