Trial on Decentralized Pre-stressed Anchor Cables with Large Tonnage
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

TV223.34

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The decentralized pre-stressed anchor cables were tested at lower drainage outlet in Yixing Energy Storage Power Station. The test procedures were introduced and analyzed. The loss of anchor cable stress during tensing and locking was analyzed and verified by test. And the project techniques were improved though test.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:May 27,2005
  • Revised:May 27,2005
  • Adopted:
  • Online:
  • Published:
Article QR Code