Abstract:The decentralized pre-stressed anchor cables were tested at lower drainage outlet in Yixing Energy Storage Power Station. The test procedures were introduced and analyzed. The loss of anchor cable stress during tensing and locking was analyzed and verified by test. And the project techniques were improved though test.