Monitoring Measurement Technology on Duct Shallow Tunneling Engineering of Metro at Guanghualu Station in Beijing
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

U455.4

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Combining monitoring measurement system technology using at west-northern duct Guanghualu station in metro of Beijing, how to control and instruct construction through monitoring surface settlement and arch crown settlement was introduced in the metro construction.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:March 18,2005
  • Revised:March 18,2005
  • Adopted:
  • Online:
  • Published:
Article QR Code