4/16/2025, 2:17:54 PM 星期三
Home
About Journal
Business News
Editorial Board
Instruction for Author
Contents Download
Academic Forum
Ethics Statement
Contact Us
中文
Home
>
Archive
>
Volume 32, Issue 9, 2005
>34-35
Online First
PDF
HTML
XML
Export
Cite reminder
Method of Bored Piles Drilling on Floating Platform on Deep Lake Area
DOI:
CSTR:
[cstr]
Author:
Find this author on All Journals
Find this author on BaiDu
Search for this author on this site
Find this author on All Journals
Find this author on BaiDu
Search for this author on this site
Find this author on All Journals
Find this author on BaiDu
Search for this author on this site
Find this author on All Journals
Find this author on BaiDu
Search for this author on this site
Find this author on All Journals
Find this author on BaiDu
Search for this author on this site
Affiliation:
Clc Number:
U443.154
Fund Project:
Article
|
Figures
|
Metrics
|
Reference
|
Related [20]
|
Cited by
|
Materials
|
Comments
Abstract:
Key words:
深水湖区
;
栽柱桩
;
浮式平台
;
冲击反循环钻进
Reference
Related
[1]
Sun DeXue;Sui HongJiu;Liu Ge;Zhang GuoCai;Chang YaLi.
Method of Bored Piles Drilling on Floating Platform on Deep Lake Area
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,2005,32(9):34-35.
[2]
Feng Yuguo.
Method of Designing Bored Pile Walls for Deep Foundation Pit Retaining
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,1996(3):14-17.
[3]
王天放,李亮,张文武.
Discussion on Rest Period of Bored Piles
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,2005,32(3):23-24.
[4]
宋慎春,武环,贾庆军.
Discussion on Application Prospect and Relative Problems of Bored Injection Piles in Qiqihaer Area
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,2006,33(5):14-15.
[5]
WU Kai-bin and DAI Guo-zhong.
The Applications of Bored Pile Drilling Tech. in Large Floating Rock in Changchun Light Rail Project
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,2004,31(12):12-13.
[6]
JIN Hong-bing.
Techniques of Constructing Bored Piles in Water
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,2005,32(8):23-24.
[7]
HUANG Zhong-gao,LI Zhi-qiang and YANG Qi-wen.
Study on Deep Hole Drilling in Zhuxi Mining Area of Jiangxi
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,2011,38(5):23-27.
[8]
CHEN Chen.
Research on Construction Technology of Grouted Ultra-long Bored Piles in Soft Soil Area
[J].Shanghai Land & Resource,2011,32(2):79-83.
[9]
韦然.
Frequently Encountered Difficult Problems and Its Countermeasures in Large Diameter Bored Piles at Dongting Lake Area
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,2004,31(5):19-21.
[10]
Cai Hongmei.
Application of the Integrality Detecting Method on the Punched Grouting Piles or Bored Piles
[J].Geology of Fujian,2009,28(2):136-142.
[11]
Xie Jun.
Construction and Inspection of 81m Deep Large Diameter Bored Piles
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,1996(2):13-15.
[12]
Cai Xiaonan,Zhang Wenyuan,WangYudong.
Construction Technology for Bored Piles of Cable-stayed Bridge Tower in Karst Area
[J].Geotechnical Engineering Technique,2019(2):66-69.
[13]
JIANG Jian-ping,GAO Guang-yun and WANG Ming-wu.
Study on Weathering Zone of Rockmass in Bored Rock-socketed Piles
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,2003,30(5):1-2.
[14]
罗绍明.
Analyses and Research on Adaptability of Bottom Enlargement Bored Piles
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,2004,31(5):17-18.
[15]
DUAN Hong-hai and HU Chun-yue.
Selection Analysis on Drilling Parameters of Deep Drilling in M24 Mining Area of Chengde
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,2011,38(3):17-20.
[16]
LI Sheng-hai,DUAN Zhi-qiang,HAN Yuan-yuan,LIU Xiao-yang,LI Jun-wei,WANG Qi and WANG Qiang.
Drilling Technology of Heyuanbei Deep Drilling Hole CUSD2 in Xiangshan Area
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,2015,42(10):6-10,16.
[17]
HOU Jia-ning.
Construction Technique of Drilling (Wash) Bored Piles in Huanan Highway in Guangzhou City
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,2005,32(4):15-17,21.
[18]
SONG Tao,LIU Bao-lin and LI Guo-min.
Icy Lake Drilling Platform and Sampling Technique of Environment Scientific Drilling in Hulun Lake in Winter
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,2008,35(10):1-6,10.
[19]
王九林.
Discussion on Cutting Clearing Countermeasure for Bored Piles
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,2004,31(9):6-9.
[20]
李效愚,王泽华,易健鹰.
Pump-suction Reverse Circulation Drilling Technology for Bored Piles Against the Lost Circulation in Zhuhai Qi''ao Bridge
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,2002(2):22-23.
Cited by
Comments
Comments
分享到微博
Submit
Get Citation
Copy
Share
0
Article Metrics
Abstract:
983
PDF:
356
HTML:
192
Cited by:
0
History
Received:
May 31,2005
Revised:
May 31,2005
Adopted:
Online:
Published:
Article QR Code