Abstract:Through the comparison and analyses of data collected from recently drilled well in Erdos Work Area, the bit model and drilling parameters of each well section and each district were optimized. The penetration rate was increased and the period of well completion was shortened. It make the drilling technology[KG*2]in North Hubei step up new footstep and speed the construction of the Erdos Gas Field.