Abstract:Selection of plan for prop pipelining with densely arranged large diameter pipes, working pit support, some problems and technical difficulties during prop pipelining were introduced, taking Laoshan water discharge project (Second modification for Chenglinzhuang Road) as an example. The relevant handling measures were given.