4/26/2025, 4:47:21 AM 星期六
Home
About Journal
Business News
Editorial Board
Instruction for Author
Contents Download
Academic Forum
Ethics Statement
Contact Us
中文
Home
>
Archive
>
Volume 32, Issue 3, 2005
>60-62
Online First
PDF
HTML
XML
Export
Cite reminder
Application of Freezing in Quicksand within Nanjing Subway Tunnel
DOI:
CSTR:
[cstr]
Author:
Find this author on All Journals
Find this author on BaiDu
Search for this author on this site
Find this author on All Journals
Find this author on BaiDu
Search for this author on this site
Affiliation:
Clc Number:
U455.49
Fund Project:
Article
|
Figures
|
Metrics
|
Reference
|
Related [20]
|
Cited by [0]
|
Materials
|
Comments
Abstract:
Key words:
地铁隧道
;
冻结法
;
流砂地层
;
防水门
;
应急预案
Reference
Related
[1]
李宏安,王定峰.
Application of Freezing in Quicksand within Nanjing Subway Tunnel
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,2005,32(3):60-62.
[2]
LI Xiangrui,Wang Ruoyao,WANG Zhiwu.
Application of Multimedia Technology in Deformation Monitoring on Subway Tunnel
[J].City Geology,2012,7(2):45-48.
[3]
LUO Qi-lu,Co.,Lt,Zhuozhou Hebei,China.
Construction Technique of Working with Water in Subway Tunnel
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,2007,34(3):58-60.
[4]
JIANG Huang,LI Xiao-zhao,YOU Sheng-wu.
A Study on the Feasibility of Ground Freezing Method in Nanjing Metro Engineering
[J].Geological Journal of China Universities,2000,6(3):479-486.
[5]
LI Shuang-yang,ZHANG Ming-yi,GAO Zhi-hua,ZHANG Shu-juan.
Thermal and Mechanical Analysis of the Artificial Freezing Method Applied to A Subway Tunnel in Guangzhou
[J].Journal of Glaciology and Geocryology,2006,28(6):823-832.
[6]
Zhang Chunhua.
Application of Artificial Freezing Method in Xuanwu Lake Subaqueous Highway Tunnel Construction
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,1999(1):49-51.
[7]
ZHUANG Qian,cheng,LUO Guo,yu,LI Xiao,zhao,YAN San,bao.
Stability Analysis of Subway in Nanjing Using Preferred Plane Theory
[J].Geological Journal of China Universities,2002,8(4):453-459.
[8]
ZHANG Yong,mou,ZHUO Pu,zhou,LI Peng.
Excavation of Deep Pit and Its Survey in Xufuxiang Stop in the Construction of Nanjing Subway Station
[J].Jiangsu Geology,2002,26(1):43-48.
[9]
ZHANG Xu,SHAO Hua,JI Bei-rong.
Influence of Foundation Pit Excavation on Adjacent Subway Tunnel
[J].Shanghai Land & Resource,2008(2):27-30.
[10]
ZHOU Tai-quan,HUA Yuan,L Bao-hua.
Stochastic Prediction for Frost Heave Effect of a Subway Tunnel
[J].Journal of Glaciology and Geocryology,2009,31(1).
[11]
ZHEN Mu-sheng,LIU Li-ming.
Selection of Treat Method for the Soft Foundations of Xiaohang Section in Nanjing Subway
[J].Jiangsu Geology,2003,27(2):107-109.
[12]
ZHOU Zuo-ming.
Application of Air Drilling with Casing in Quicksand Layer of South Sudan Water Supply Well
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,2017,44(4):36-38.
[13]
LI Juan.
Parameter Control of Synchronous Grouting in Shield Tunnel Construction for Subway
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,2014,41(4):82-84.
[14]
HAN Xiao-ming,TANG Xiao-peng and JI Yu-guo.
Freezing Construction Technique of Launching Section of Shield in Large Cross-river Tunnel
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,2012,39(12):72-75.
[15]
Liu,Bo,Li,Haibin,Li,Li,Zhao,Qingpan,Gao,Jiankang.
Construction Technique of Vertical Shafts Excavation Above Subway Tunnel
[J].Geotechnical and Geological Engineering,2021,39(6):4225-4235.
[16]
CHEN Xi,wen.
Foundation Pits Classification of Subway Stations in Nanjing Line One
[J].Jiangsu Geology,2002,26(3):165-170.
[17]
CHEN Yu-kang and HE Li-jun.
Technology and Analysis on Freezing Consolidation Construction in Side Channels and Pumping Station of the Test Section of Nanjing Subway
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,2008,35(9):70-75.
[18]
YANG Tian-Liang,YAN Xue-Xin,WANG Han-Mei,ZHAN Long-Xi.
Study on Engineering Land Subsidence Caused by Shield Construction in Subway Tunnel
[J].Shanghai Land & Resource,2010,31(Z1).
[19]
QU Zhaolei.
Auxiliary intervention technology in shield tunneling at atmospheric pressure in the Nanning Subway Tunnel
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,2020,47(2):88-93.
[20]
ZHANG Zhi-bo.
Risks Analysis on Large Slurry Shield Tunnel Construction in Nanjing Yangtze River Tunnel and the Countermeasures
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,2011,38(6):65-69.
Cited by
[1]
Li Hongan,He Manchao,Lei Jun,Lu Yan.
Application of Freezing Process by Liquid Nitrogen in the Place of Shield Departure for Strengthening Strata Work
[J].Municipal Engineering Technology,2008,26(6).
[2]
HAO Ji-feng,LI Ming-xin.
Freezing Technology Application in the Beginning of TBM for the Project of Yellow River Crossing Tunnel in the South-to-North Water Diversion Middle Route
[J].South-to-North Water Transfers and Water Science & Technology,2008,6(6).
[3]
Li Hongan,He Manchao,Lei Jun,Lu Yan.
Application of Freezing Process by Liquid Nitrogen in the Place of Shield Departure for Strengthening Strata Work
[J].Municipal Engineering Technology,2008,26(6).
Comments
Comments
分享到微博
Submit
Get Citation
Copy
Share
0
Article Metrics
Abstract:
958
PDF:
291
HTML:
167
Cited by:
0
History
Received:
October 08,2004
Revised:
October 08,2004
Adopted:
Online:
Published:
Article QR Code