Abstract:The current situation and deficiency of underground water level lowing equipment were analyzed. Suggestion that weight of existing light groundwater level lowing equipment be further decreased is put forwards. The methods to decrease weight of equipment were introduced. The good results of decreasing weight of equipment were proven by engineering use.