Abstract:This paper expounded main engineering geologic problems met with in TBM excavation of Shanggongshan Tunnel, such as fault fractured zones, joint concentrated zones, big deformation of soft rock, karst and groundwater etc, and introduced corresponding countermeasures in detail.